Project Completion Certificate (Ground Water)
Scheme ID: 20090424 Name of Scheme: BISAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1608 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 06-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 30 / 123.32 Bisat 29.291373 78.23855
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 320 /52 Bisat 29.291373 78.23855
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100 / 12 Bisat 29.291373 78.23855
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 100 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.722
2 HDPE 75 0.498
3 HDPE 90 0.167
4 HDPE 110 0.255
5 HDPE 125 0.151
6 HDPE 140 0.039
7 HDPE 160 0.034
HSC Connection
Sno. Total Nos.
1 424
Other Details
1.61
0.00
1.63
19-Nov-2025
20-Nov-2025