Project Completion Certificate (Ground Water)
Scheme ID: 20090432 Name of Scheme: SALEMPUR MATHNA WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 1677 Base Year: 2023 Intermediate Year: 2038 Design Year: 2052
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 21-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 SUBMERSIBLE 36.04/120.35 SALEMPUR MATHNA 29.355538 78.119917
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 360/52 SALEMPUR MATHNA 29.355538 78.119917
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100/16 SALEMPUR MATHNA 29.355538 78.119917
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 0.018
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.621
2 HDPE 75 0.372
3 HDPE 90 1.146
4 HDPE 110 1.014
5 HDPE 180 0.055
HSC Connection
Sno. Total Nos.
1 274
Other Details
1.90
0.00
1.89
22-Nov-2024
21-Feb-2025