| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20090432 | Name of Scheme: SALEMPUR MATHNA WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 1677 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2052 |
| Date of Completion (As per Contract): 06-Jul-2023 | Actual Date of Completion (Capex): 21-Aug-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 36.04/120.35 | SALEMPUR MATHNA | 29.355538 | 78.119917 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 360/52 | SALEMPUR MATHNA | 29.355538 | 78.119917 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 100/16 | SALEMPUR MATHNA | 29.355538 | 78.119917 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 100 | 0.018 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.621 | |
| 2 | HDPE | 75 | 0.372 | |
| 3 | HDPE | 90 | 1.146 | |
| 4 | HDPE | 110 | 1.014 | |
| 5 | HDPE | 180 | 0.055 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 274 |