Project Completion Certificate (Ground Water)
Scheme ID: 20091027 Name of Scheme: FAZALPUR WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2908 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-Jun-2024 Actual Date of Completion (Capex): 30-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 SUBMERSIBLE 30.05/125.53 FAZALPUR 29.537237 78.074286
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 570/52 FAZALPUR 29.537237 78.074286
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/12 FAZALPUR 29.537237 78.074286
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K7 150 0.041
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.904
2 HDPE 75 1.4403
3 HDPE 90 2.3879
4 HDPE 110 0.701
5 HDPE 125 0.324
6 HDPE 160 0.013
HSC Connection
Sno. Total Nos.
1 453
Other Details
2.05
0.00
2.04
29-Dec-2024
30-Dec-2024