| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20091088 | Name of Scheme: ROHUWAR & BELKUNDA GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 4 | No. of Habitation Covered: 7 |
| Total Population Covered: 2215 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 15-Sep-2024 | Actual Date of Completion (Capex): 31-Jul-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TW-Rohuwar | 165/128.30 | belkunda | 26.238336 | 83.359057 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | AC submercible | 43.20/47 | belkunda | 26.238336 | 83.359057 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Zincalume Tank | 200/14 | belkunda | 26.238463 | 83.359268 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 150 | 30 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 2956 | |
| 2 | HDPE | 75 | 6078 | |
| 3 | HDPE | 63 | 12870 | |
| 4 | HDPE | 110 | 2073 | |
| 5 | HDPE | 140 | 1555 | |
| 6 | HDPE | 160 | 342 | |
| 7 | HDPE | 200 | 29 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 520 |