Project Completion Certificate (Ground Water)
Scheme ID: 20091128 Name of Scheme: Sihauli PWS No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 1182 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jan-2022 Actual Date of Completion (Capex): 05-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 .915
2 HDPE 90 4.201
HSC Connection
Sno. Total Nos.
Other Details
1.21
0.00
1.24
30-Jan-2024
31-Jan-2024