Project Completion Certificate (Ground Water)
Scheme ID: 20091142 Name of Scheme: Tilakpur Sahar PWS No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1313 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 24-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 20.89 M / 98.3 M Tilakpur Sahar 26.74733 79.572231
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Sumersible 250 LPM / 49 M Tilakpur Sahar 26.74733 79.572231
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 50 KL / 12 M Tilakpur Sahar 26.74733 79.572231
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 100 0.014
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.760
2 HDPE 90 1.116
3 HDPE 110 0.387
4 HDPE 125 0.906
HSC Connection
Sno. Total Nos.
1 280
Other Details
1.21
0.00
1.30
23-Mar-2024
25-Mar-2024