Project Completion Certificate (Ground Water)
Scheme ID: 20091177 Name of Scheme: Kasba senganpur & Aima senganpur No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 5791 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jan-2022 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.657
2 HDPE 90 2.815
3 HDPE 110 .652
4 HDPE 140 .329
5 HDPE 160 .085
6 HDPE 180 .080
HSC Connection
Sno. Total Nos.
Other Details
3.21
0.00
3.33
25-May-2024
27-May-2024