Project Completion Certificate (Ground Water)
Scheme ID: 20091196 Name of Scheme: KORO GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1928 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 22-Mar-2024 Actual Date of Completion (Capex): 22-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 15 / 80.91 KORO 26.438542 82.060121
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 460 LPM / 45 M KORO 26.438542 82.060121
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125 KL / 12 M KORO 26.438542 82.060121
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI / K7 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / PN-6: Class PE -100 63 9.331
2 HDPE / PN-6: Class PE -100 75 0.756
3 HDPE / PN-6: Class PE -100 90 0.883
4 HDPE / PN-6: Class PE -100 110 0.322
5 HDPE / PN-6: Class PE -100 125 0
6 HDPE / PN-6: Class PE -100 140 0.036
7 HDPE / PN-6: Class PE -100 160 0
8 HDPE / PN-6: Class PE -100 180 0
9 HDPE / PN-6: Class PE -100 200 0
HSC Connection
Sno. Total Nos.
1 428
Other Details
1.76
0.00
1.80
28-Nov-2024
01-Dec-2024