| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20091198 | Name of Scheme: HANNA HARAURA GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 14 |
| Total Population Covered: 5495 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 22-Mar-2024 | Actual Date of Completion (Capex): 22-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 27.00 M / 82.80 M | Hanna Haraura | 26.45669 | 82.00514 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 730 LPM / 51 M | Hanna Haraura | 26.45669 | 82.00514 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200 KL / 18 M | Hanna Haraura | 26.45669 | 82.00514 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI / K7 | 150 | 0.31 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / PN-6: Class PE-100 | 63 | 14.615 | |
| 2 | HDPE / PN-6: Class PE-100 | 75 | 1.978 | |
| 3 | HDPE / PN-6: Class PE-100 | 90 | 3.484 | |
| 4 | HDPE / PN-6: Class PE-100 | 110 | 0.742 | |
| 5 | HDPE / PN-6: Class PE-100 | 125 | 1.908 | |
| 6 | HDPE / PN-6: Class PE-100 | 160 | 0.1 | |
| 7 | HDPE / PN-6: Class PE-100 | 180 | 0.265 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 769 |