| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20091277 | Name of Scheme: MILIK MAJMULLA MVS | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 2174 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Mar-2025 | Actual Date of Completion (Capex): 30-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24/125 | MILIK MAJMULLA | 27.415511 | 79.483115 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersibel Pump | 500LPM/61M | MILIK MAJMULLA | 27.415511 | 79.483115 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 125KL/14M | MILIK MAJMULLA | 27.415511 | 79.483115 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 27.10 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 1.410 | |
| 2 | HDPE | 63 | 3.509 | |
| 3 | HDPE | 110 | 1.462 | |
| 4 | HDPE | 140 | 1.547 | |
| 5 | HDPE | 160 | 0.229 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 370 |