Project Completion Certificate (Ground Water)
Scheme ID: 20091277 Name of Scheme: MILIK MAJMULLA MVS No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2174 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Mar-2025 Actual Date of Completion (Capex): 30-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24/125 MILIK MAJMULLA 27.415511 79.483115
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersibel Pump 500LPM/61M MILIK MAJMULLA 27.415511 79.483115
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125KL/14M MILIK MAJMULLA 27.415511 79.483115
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 27.10
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.410
2 HDPE 63 3.509
3 HDPE 110 1.462
4 HDPE 140 1.547
5 HDPE 160 0.229
HSC Connection
Sno. Total Nos.
1 370
Other Details
2.49
2.42
2.45
11-Mar-2025
12-Mar-2025