Project Completion Certificate (Ground Water)
Scheme ID: 20091285 Name of Scheme: GANGLAU PARMNAGAR & SADIKPUR MVS No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2741 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 13-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.14M/125.18M GANGLAU PARMNAGAR 27.46373 79.46208
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 600LPM/66M GANGLAU PARMNAGAR 27.46373 79.46208
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175KL/14M GANGLAU PARMNAGAR 27.46373 79.46208
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 1.990
2 HDPE PIPE 63 4.925
3 HDPE PIPE 110 1.235
4 HDPE PIPE 125 0.916
5 HDPE PIPE 140 0.507
6 HDPE PIPE 160 0.237
HSC Connection
Sno. Total Nos.
1 456
Other Details
3.03
2.95
3.03
13-Jun-2024
14-Jun-2024