| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20091369 | Name of Scheme: RAIPUR CHINGHATPUR & DHARAMPUR & SINAULI MVS | No. of Villages: 4 | No. of Habitation Covered: 6 |
| Total Population Covered: 3001 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 30-May-2025 | Actual Date of Completion (Capex): 08-Jul-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 17.02 M / 92.38 M | RAIPUR CHINGHATPUR | 27.62070 | 79.31078 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | PUMP | 650 LPM / 65 M | RAIPUR CHINGHATPUR | 27.62070 | 79.31078 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200 KL / 18 M | RAIPUR CHINGHATPUR | 27.62070 | 79.31078 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE/ K-7 | 100 | 0.017 | COMPLETE |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 3.546 | COMPLETE |
| 2 | HDPE | 63 | 8.600 | COMPLETE |
| 3 | HDPE | 110 | 2.003 | COMPLETE |
| 4 | HDPE | 140 | 3.640 | COMPLETE |
| 5 | HDPE | 160 | 2.100 | COMPLETE |
| 6 | HDPE | 180 | .129 | COMPLETE |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 730 |