Project Completion Certificate (Ground Water)
Scheme ID: 20091374 Name of Scheme: CHAITAWA WSS No. of Villages: 1 No. of Habitation Covered: 9
Total Population Covered: 3350 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 20-Mar-2024 Actual Date of Completion (Capex): 28-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24/104.3 CHAITAWA 26.558669 82.3206011
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP 710/40 CHAITAWA 26.558669 82.3206011
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225/12 CHAITAWA 26.558669 82.3206011
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6:CLASS PE-100 200 0
2 HDPE PIPE PN-6:CLASS PE-100 180 0.055
3 HDPE PIPE PN-6:CLASS PE-100 160 0.237
4 HDPE PIPE PN-6:CLASS PE-100 140 .572
5 HDPE PIPE PN-6:CLASS PE-100 125 0.009
6 HDPE PIPE PN-6:CLASS PE-100 110 1.326
7 HDPE PIPE PN-6:CLASS PE-100 90 1.754
8 HDPE PIPE PN-6:CLASS PE-100 75 .670
9 HDPE PIPE PN-6:CLASS PE-100 63 12.669
HSC Connection
Sno. Total Nos.
1 658
Other Details
2.62
0.00
3.15
28-Oct-2024
16-Jan-2025