Project Completion Certificate (Ground Water)
Scheme ID: 20091718 Name of Scheme: TURKIPUR MVS No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2719 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-Nov-2024 Actual Date of Completion (Capex): 05-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24 M/124 M TURKIPUR 27.42065 79.49402
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 600 LPM/59 M TURKIPUR 27.42065 79.49402
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL /12 M TURKIPUR 27.42065 79.49402
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 100 0.029
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1942.50
2 HDPE 63 4546.30
3 HDPE 110 1221.50
HSC Connection
Sno. Total Nos.
1 433
Other Details
2.75
2.65
2.65
01-Dec-2024
02-Dec-2024