Project Completion Certificate (Ground Water)
Scheme ID: 20091728 Name of Scheme: SHERPUR SARAI MVS No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 2212 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Mar-2025 Actual Date of Completion (Capex): 17-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18/132 Sherpur Sarai 27.215471 79.704745
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 500 LMM/61 Mtr Sherpur Sarai 27.215471 79.704745
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 1.570
2 HPPE PIPE 63 3.087
3 HDPE PIPE 110 0.737
4 HDPE PIPE 125 0.821
5 HDPE PIPE 140 0.882
6 HDPE 160 0.345
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 0.02
HSC Connection
Sno. Total Nos.
1 384
Other Details
2.43
2.01
2.01
30-Mar-2025
01-Apr-2025