| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20091736 | Name of Scheme: MURAN & NAGLA SOODAN MVS | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 3391 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 30-May-2025 | Actual Date of Completion (Capex): 09-Feb-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 28M/100.25m | MURAN & NAGLA SOODAN | 27.332031 | 79.331994 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersibel Pump | 700LPM/63M | MURAN & NAGLA SOODAN | 27.332031 | 79.331994 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 200KL/16M | MURAN & NAGLA SOODAN | 27.332031 | 79.331994 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 27.40 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 1.611 | |
| 2 | HDPE | 63 | 4.124 | |
| 3 | HDPE | 110 | 0.922 | |
| 4 | HDPE | 125 | 0.120 | |
| 5 | HDPE | 140 | 0.553 | |
| 6 | HDPE | 160 | 1.495 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 704 |