Project Completion Certificate (Ground Water)
Scheme ID: 20091736 Name of Scheme: MURAN & NAGLA SOODAN MVS No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3391 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 09-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 28M/100.25m MURAN & NAGLA SOODAN 27.332031 79.331994
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersibel Pump 700LPM/63M MURAN & NAGLA SOODAN 27.332031 79.331994
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200KL/16M MURAN & NAGLA SOODAN 27.332031 79.331994
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 27.40
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.611
2 HDPE 63 4.124
3 HDPE 110 0.922
4 HDPE 125 0.120
5 HDPE 140 0.553
6 HDPE 160 1.495
HSC Connection
Sno. Total Nos.
1 704
Other Details
3.19
3.11
3.17
24-May-2024
25-May-2024