Project Completion Certificate (Ground Water)
Scheme ID: 20092017 Name of Scheme: JARHARI MVS No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2543 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 11-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 21.05 M / 125.29 M JARHARI 27.44622 79.28399
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 PUMP 600 LPM / 59 M JARHARI 27.44622 79.28399
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL / 12 M JARHARI 27.44622 79.28399
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI / K-7 100 15.8 COMPLETE
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 .913 COMPLETE
2 HDPE 63 5.429 COMPLETE
3 HDPE 110 .835 COMPLETE
4 HDPE 140 .216 COMPLETE
5 HDPE 160 1.064 COMPLETE
6 HDPE 180 .018 COMPLETE
HSC Connection
Sno. Total Nos.
1 466
Other Details
2.51
2.45
2.50
11-Oct-2024