| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20092017 | Name of Scheme: JARHARI MVS | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 2543 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 30-May-2025 | Actual Date of Completion (Capex): 11-Oct-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 21.05 M / 125.29 M | JARHARI | 27.44622 | 79.28399 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | PUMP | 600 LPM / 59 M | JARHARI | 27.44622 | 79.28399 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 KL / 12 M | JARHARI | 27.44622 | 79.28399 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI / K-7 | 100 | 15.8 | COMPLETE |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | .913 | COMPLETE |
| 2 | HDPE | 63 | 5.429 | COMPLETE |
| 3 | HDPE | 110 | .835 | COMPLETE |
| 4 | HDPE | 140 | .216 | COMPLETE |
| 5 | HDPE | 160 | 1.064 | COMPLETE |
| 6 | HDPE | 180 | .018 | COMPLETE |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 466 |