| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20092026 | Name of Scheme: VEERPUR MVS | No. of Villages: 2 | No. of Habitation Covered: 5 |
| Total Population Covered: 3139 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2023 |
| Date of Completion (As per Contract): 30-Nov-2024 | Actual Date of Completion (Capex): 09-May-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 27 M/108 M | VEERPUR | 27.43669 | 79.37524 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 700 LPM/59 M | VEERPUR | 27.43669 | 79.37524 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 200 KL/12 M | VEERPUR | 27.43669 | 79.37524 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 150 | 0.01 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 1238 | |
| 2 | HDPE | 63 | 6086 | |
| 3 | HDPE | 110 | 981 | |
| 4 | HDPE | 140 | 529 | |
| 5 | HDPE | 160 | 1012 | |
| 6 | HDPE | 180 | 236 | |
| 7 | HDPE | 200 | 507 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 582 |