Project Completion Certificate (Ground Water)
Scheme ID: 20092171 Name of Scheme: Kusumhi Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 4540 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 21-Jan-2025 Actual Date of Completion (Capex): 10-Sep-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21/150.20 kusumhi 26.731802 83.492366
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 39/41 Kusumhi 2.731802 83.492366
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 175/14 Kusumhi 26.731619 83.492163
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.030 Pipe Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 140 0.212 Laying Completed
2 HDPE 110 0.549 Laying Completed
3 HDPE 90 0.159 Laying Completed
4 HDPE 63 9.207 Laying Completed
HSC Connection
Sno. Total Nos.
1 530
Other Details
1.96
0.00
1.95
09-Sep-2025
10-Jan-2025