Project Completion Certificate (Ground Water)
Scheme ID: 20092206 Name of Scheme: Changahi Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1930 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 21-Jan-2025 Actual Date of Completion (Capex): 25-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 15.00/98.82 Changahi 26.751793 83.519848
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 24/39 Changahi 26.751793 83.519848
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over Head Tank-1 125/12 Changahi 26.745972 83.520847
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.030 Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.749 Completed
2 HDPE 75 0.539.5 Completed
3 HDPE 110 0.117 Completed
4 HDPE 140 0.125 Completed
HSC Connection
Sno. Total Nos.
1 345
Other Details
1.44
0.00
1.43
24-Oct-2024
10-Jan-2025