| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20092206 | Name of Scheme: Changahi Water Supply Scheme | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1930 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 21-Jan-2025 | Actual Date of Completion (Capex): 25-Oct-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 15.00/98.82 | Changahi | 26.751793 | 83.519848 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 24/39 | Changahi | 26.751793 | 83.519848 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Over Head Tank-1 | 125/12 | Changahi | 26.745972 | 83.520847 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.030 | Completed |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.749 | Completed |
| 2 | HDPE | 75 | 0.539.5 | Completed |
| 3 | HDPE | 110 | 0.117 | Completed |
| 4 | HDPE | 140 | 0.125 | Completed |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 345 |