Project Completion Certificate (Ground Water)
Scheme ID: 20092401 Name of Scheme: BADLI MV GP W/S SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 6562 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Sep-2024 Actual Date of Completion (Capex): 30-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.07 / 81.67 Badli 28.967147 78.931798
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 25 HP Submersible Pump 91.2 / 44 Badli 28.967147 78.931798
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Conventional OHT 450 / 16 Badli 28.966994 78.931596
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 200 .019
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 75 0.482
2 HDPE Pipe PN-6: Class PE-100 90 0.676
3 HDPE Pipe PN-6: Class PE-100 63 5.952
4 HDPE Pipe PN-6: Class PE-100 110 0.526
5 HDPE Pipe PN-6: Class PE-100 125 0.590
6 HDPE Pipe PN-6: Class PE-100 140 0.395
7 HDPE Pipe PN-6: Class PE-100 160 0.962
8 HDPE Pipe PN-6: Class PE-100 180 1.042
9 HDPE Pipe PN-6: Class PE-100 200 0.373
HSC Connection
Sno. Total Nos.
1 1125
Other Details
3.06
3.40
3.40
31-Mar-2024
01-Apr-2024