Project Completion Certificate (Ground Water)
Scheme ID: 20092406 Name of Scheme: THEWGA WSS No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2165 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 21-Jun-2024 Actual Date of Completion (Capex): 08-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.00/112.30 DEOGA 26.751458 81.923698
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP 442LPM / 40Mtr DEOGA 26.751458 81.923698
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/12 DEOGA 26.751432 81.923606
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.021
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 200 0.0000
2 HDPE Pipe PN-6: Class PE-100 180 0.0000
3 HDPE Pipe PN-6: Class PE-100 160 0.2152
4 HDPE Pipe PN-6: Class PE-100 140 0.3256
5 HDPE Pipe PN-6: Class PE-100 125 0.3728
6 HDPE Pipe PN-6: Class PE-100 110 0.0890
7 HDPE Pipe PN-6: Class PE-100 90 0.000
8 HDPE Pipe PN-6: Class PE-100 75 0.8731
9 HDPE Pipe PN-6: Class PE-100 63 5.6041
HSC Connection
Sno. Total Nos.
1 410
Other Details
1.76
0.00
2.12
08-Dec-2024
01-Feb-2025