| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20092428 | Name of Scheme: BHATASA & CHILSARI MVS | No. of Villages: 2 | No. of Habitation Covered: 4 |
| Total Population Covered: 4363 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 30-May-2025 | Actual Date of Completion (Capex): 02-Jul-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 19M/109.38M | BHATASA | 27.50254 | 79.37017 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 900LPM/65M | BHATASA | 27.50254 | 79.37017 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 250KL/18M | BHATASA | 27.50254 | 79.37017 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.022 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 1.720 | |
| 2 | HDPE PIPE | 63 | 7.890 | |
| 3 | HDPE PIPE | 110 | 0.116 | |
| 4 | HDPE PIPE | 140 | 0.531 | |
| 5 | HDPE PIPE | 160 | 1.633 | |
| 6 | HDPE PIPE | 180 | 0.630 | |
| 7 | HDPE PIPE | 200 | 0.043 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |