Scheme ID: 20092455 Name of Scheme: BHULANPUR CHIRPURA MVS No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 1996 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Mar-2025 Actual Date of Completion (Capex): 26-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18/85.40 BHULANPUR CHIRPURA 27.304053 79.616222
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersibel Pump 450 LPM/61 M BHULANPUR CHIRPURA 27.304053 79.616222
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125 KL/14 M BHULANPUR CHIRPURA 27.304053 79.616222
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 17
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.900
2 HDPE 63 5.965
3 HDPE 110 0.422
4 HDPE 140 1.270
HSC Connection
Sno. Total Nos.
1 387
Other Details
2.53
2.47
2.50
09-Apr-2025
10-Apr-2025