Project Completion Certificate (Ground Water)
Scheme ID: 20092462 Name of Scheme: JAHANIYAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 8
Total Population Covered: 2960 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 14-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Plain pipe 150mm dia 48 TW 26.003683 83.522933
2 Plain pipe 300mm dia 54 TW 26.003683 83.522933
3 Slotted pipe 150mm dia 30 TW 26.003683 83.522933
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible pump 620LMP/44M TW 26.003683 83.522933
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zincalume tank 200/14 TW 26.003683 83.522933
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K7 125 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN6 PE100 63 11.81
2 HDPE PN6 PE100 75 3.35
3 HDPE PN6 PE100 90 0.885
4 HDPE PN6 PE100 110 1.25
5 HDPE PN6 PE100 125 0.295
6 HDPE PN6 PE100 140 0.216
7 HDPE PN6 PE100 160 0.389
8 HDPE PN6 PE100 180 0.461
9 HDPE PN6 PE100 200 0.151
HSC Connection
Sno. Total Nos.
1 444
Other Details
236.65
0.00
235.64
13-Feb-2025
14-Feb-2025