| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20092557 | Name of Scheme: KANDHERI MUNGESAR GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 7 |
| Total Population Covered: 3060 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 30-Jun-2025 | Actual Date of Completion (Capex): 16-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | plain pipe 150 mm dia | 39 | TW | 25.890895 | 83.606227 |
| 2 | plain pipe 300 mm dia | 54 | TW | 25.890895 | 83.606227 |
| 3 | Pipe slotted pipe 150 dia | 24 | TW | 25.890895 | 83.606227 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 630LPM/44 | TW | 25.890895 | 83.606227 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Zincalume tank | 200/14 | OHT | 25.891037 | 83.606245 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K7 | 125 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 63 | 16.31 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 75 | 1.78 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 90 | 3.4 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 110 | 0.88 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 125 | 0.777 | |
| 6 | HDPE Pipe PN-6: Class PE-100 | 140 | 0.436 | |
| 7 | HDPE Pipe PN-6: Class PE-100 | 160 | 0.212 | |
| 8 | HDPE Pipe PN-6: Class PE-100 | 180 | 0.356 | |
| 9 | HDPE Pipe PN-6: Class PE-100 | 200 | 0.024 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 452 |