| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20092633 | Name of Scheme: DIH & MEGHMAU GRAM PANCHAYAT WATER SUPLLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 22 |
| Total Population Covered: 14904 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 18-Jul-2024 | Actual Date of Completion (Capex): 02-Feb-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 45.01 M / 125.61 M | Dih & Meghmau | 26.486868 | 81.845308 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 960 LPM / 50 M | Dih & Meghmau | 26.486868 | 81.845308 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 550 KL / 18 M | Dih & Meghmau | 26.486868 | 81.845308 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI / K7 | 150 | 0.014 | |
| 2 | DI / K7 | 200 | 1.156 | |
| 3 | DI / K7 | 250 | 0.130 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / PN-6: Class PE-100 | 63 | 32.87 | |
| 2 | HDPE / PN-6: Class PE-100 | 75 | 10.943 | |
| 3 | HDPE / PN-6: Class PE-100 | 90 | 3.341 | |
| 4 | HDPE / PN-6: Class PE-100 | 110 | 2.301 | |
| 5 | HDPE / PN-6: Class PE-100 | 125 | 1.706 | |
| 6 | HDPE / PN-6: Class PE-100 | 140 | 1.273 | |
| 7 | HDPE / PN-6: Class PE-100 | 160 | 2.548 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1862 |