Project Completion Certificate (Ground Water)
Scheme ID: 20092651 Name of Scheme: kamalpur No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 4265 Base Year: 2023 Intermediate Year: 2038 Design Year: 2023
Date of Completion (As per Contract): 30-Apr-2024 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 8/54.30 KAMALPUR 26.260145 79.691126
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 850/72 KAMALPUR 26.260145 79.691126
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 250/16 KAMALPUR 26.260145 79.691126
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.47
2 HDPE 90 1.398
3 HDPE 110 1.229
4 HDPE 140 0.053
5 HDPE 160 1.352
6 HDPE 180 0.015
HSC Connection
Sno. Total Nos.
1 814
Other Details
3.32
0.00
3.31
01-Apr-2024
02-Apr-2024