Project Completion Certificate (Ground Water)
Scheme ID: 20092701 Name of Scheme: NARHARIYA KARAMPUR Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 3470 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 24-Mar-2024 Actual Date of Completion (Capex): 01-Jul-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 27/43.80 NARAHIYA KARAMPUR 26O 27' 36.59" N 82O26' 47.86" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump-1 42.60/44 NARAHIYA KARAMPUR 26O 27' 36.59" N 82O26' 47.86" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC- Zink Alum Tank 200/14 NARAHIYA KARAMPUR 26O 27' 36.33" N 82O26' 47.47" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 18.392
2 HDPE Pipe PN-6: Class PE-100 75 1.237
3 HDPE Pipe PN-6: Class PE-100 90 2.188
4 HDPE Pipe PN-6: Class PE-100 110 0.598
5 HDPE Pipe PN-6: Class PE-100 125 0.375
6 HDPE Pipe PN-6: Class PE-100 140 0.893
7 HDPE Pipe PN-6: Class PE-100 200 0.008
HSC Connection
Sno. Total Nos.
1 800
Other Details
269.85
0.00
0.00
17-Oct-2025
18-Oct-2025