| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20092701 | Name of Scheme: NARHARIYA KARAMPUR Water Supply Scheme | No. of Villages: 2 | No. of Habitation Covered: 7 |
| Total Population Covered: 3470 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 24-Mar-2024 | Actual Date of Completion (Capex): 01-Jul-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 27/43.80 | NARAHIYA KARAMPUR | 26O 27' 36.59" N | 82O26' 47.86" E |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VTPump-1 | 42.60/44 | NARAHIYA KARAMPUR | 26O 27' 36.59" N | 82O26' 47.86" E |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC- Zink Alum Tank | 200/14 | NARAHIYA KARAMPUR | 26O 27' 36.33" N | 82O26' 47.47" E |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI Pipe K-7 | 100 | 0.04 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 63 | 18.392 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 75 | 1.237 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 90 | 2.188 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 110 | 0.598 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 125 | 0.375 | |
| 6 | HDPE Pipe PN-6: Class PE-100 | 140 | 0.893 | |
| 7 | HDPE Pipe PN-6: Class PE-100 | 200 | 0.008 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 800 |