Project Completion Certificate (Ground Water)
Scheme ID: 20092709 Name of Scheme: naubadpur No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1918 Base Year: 2023 Intermediate Year: 2038 Design Year: 2023
Date of Completion (As per Contract): 31-Mar-2024 Actual Date of Completion (Capex): 15-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 8/53.28 NAUBADPUR 26°20'8742"N 79°73'6475"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 200/69 NAUBADPUR 26°20'8742"N 79°73'6475"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 50/12 NAUBADPUR 26°20'8742"N 79°73'6475"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.14
2 HDPE 90 1.29
3 HDPE 110 0.334
4 HDPE 140 0.192
HSC Connection
Sno. Total Nos.
1 340
Other Details
1.38
1.38
1.48
25-Apr-2024
26-Apr-2024