| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20092860 | Name of Scheme: PATTI DARAPUR MVS | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 2972 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Mar-2025 | Actual Date of Completion (Capex): 02-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24/60 | Patti Darapur | 27.389474 | 79.658011 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 650 LPM/61 Mtr | Patti Darapur | 27.389474 | 79.658011 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 2.325 | |
| 2 | HPDPE PIPE | 63 | 5.931 | |
| 3 | HDPE | 110 | 2.633 | |
| 4 | HDPE | 140 | 1.181 | |
| 5 | HDPE | 180 | 0.453 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 100 | 23.50 | |