Project Completion Certificate (Ground Water)
Scheme ID: 20092860 Name of Scheme: PATTI DARAPUR MVS No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2972 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Mar-2025 Actual Date of Completion (Capex): 02-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24/60 Patti Darapur 27.389474 79.658011
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 650 LPM/61 Mtr Patti Darapur 27.389474 79.658011
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 2.325
2 HPDPE PIPE 63 5.931
3 HDPE 110 2.633
4 HDPE 140 1.181
5 HDPE 180 0.453
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 23.50
HSC Connection
Sno. Total Nos.
Other Details
3.31
2.71
2.66
15-Dec-2024
16-Dec-2024