Project Completion Certificate (Ground Water)
Scheme ID: 20092931 Name of Scheme: BAMIYARI PAKHARPUR (VPL) PWS No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2000 Base Year: 2023 Intermediate Year: 2038 Design Year: 2052
Date of Completion (As per Contract): 03-Oct-2024 Actual Date of Completion (Capex): 31-Jan-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 0.45cum/min, 45m Bamiyari 27.410982 81.468658
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over head Tank 125Kl,12m Bamiyari 27.410982 81.468658
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K9/DI 100 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN6/HDPE 63 2.95
2 PN6/HDPE 75 0.788
3 PN6/HDPE 90 0.553
4 PN6/HDPE 110 0.042
5 PN6/HDPE 160 0.370
HSC Connection
Sno. Total Nos.
1 250
Other Details
1.76
1.76
1.70
30-Apr-2026
01-May-2026