Project Completion Certificate (Ground Water)
Scheme ID: 20093040 Name of Scheme: BEHTABALLU SVS No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 1510 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 18-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 6M/112.05M BEHTABALLU 27.60050 79.42845
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 submersible Pump 150LPM/59M BEHTABALLU 27.60050 79.42845
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 50KL/12M BEHTABALLU 27.60050 79.42845
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 1.876
2 HDPE PIPE 63 5.389
3 HDPE PIPE 140 0.384
HSC Connection
Sno. Total Nos.
1 299
Other Details
1.81
1.77
1.73
18-Jun-2024