Project Completion Certificate (Ground Water)
Scheme ID: 20093064 Name of Scheme: KHAN PUR SVS No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 6004 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 03-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL-1 24.42 M / 109.93 M KHAN PUR 27.39739 79.59748
2 TUBEWELL-2 24.00 M / 125.42 M KHAN PUR 27.3931 79.59598
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 PUMP-1 650LPM / 65 M KHAN PUR 27.39739 79.59748
2 PUMP-2 650LPM / 65 M KHAN PUR 27.3931 79.59598
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 375 KL / 18 M KHAN PUR 27.39739 79.59748
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 .438 COMPLETE
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 .784 COMPLETE
2 HDPE 63 13.846 COMPLETE
3 HDPE 140 1.05 COMPLETE
4 HDPE 160 1.254 COMPLETE
5 HDPE 180 .527 COMPLETE
6 HDPE 200 .075 COMPLETE
7 HDPE 110 0.714 COMPLETE
HSC Connection
Sno. Total Nos.
1 1601
Other Details
6.27
6.11
6.38
03-Jul-2024
04-Jul-2024