Project Completion Certificate (Ground Water)
Scheme ID: 20093133 Name of Scheme: HOTEPUR MVS No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2488 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 09-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21M/127M HOTEPUR 27.58873 79.26966
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersibel Pump 550LPM/63M HOTEPUR 27.58873 79.26966
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150KL/16M HOTEPUR 27.58873 79.26966
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.023
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.836
2 HDPE 63 5.830
3 HDPE 110 0.507
4 HDPE 140 0.924
5 HDPE 160 0.092
HSC Connection
Sno. Total Nos.
1 422
Other Details
2.71
2.60
2.62
24-May-2024
25-May-2024