Project Completion Certificate (Ground Water)
Scheme ID: 20093157 Name of Scheme: LAKHAN PUR MVS No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 3447 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 18-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 26M/114m LAKHAN PUR 27.58274 79.32759
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersibel Pump 750LPM/65M LAKHAN PUR 27.58274 79.32759
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225KL/14M LAKHAN PUR 27.58274 79.32759
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.519
2 HDPE 63 5.310
3 HDPE 110 0.718
4 HDPE 140 1.053
5 HDPE 160 0.388
6 HDPE 180 0.573
HSC Connection
Sno. Total Nos.
1 888
Other Details
3.54
3.42
3.53
02-May-2024
03-May-2024