Project Completion Certificate (Ground Water)
Scheme ID: 20093172 Name of Scheme: CHANDANPUR & MAKRAND NAGAR BASAHA MVS No. of Villages: 4 No. of Habitation Covered: 9
Total Population Covered: 4875 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 11-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 27.08 M / 86.44 M SABALPUR 27.23471 79.65790
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 PUMP 1000 PLM / 65 M SABALPUR 27.23471 79.65790
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300 KL / 18 M SABALPUR 27.23471 79.65790
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE / K-7 150 .025 COMPLETE
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.572 COMPLETE
2 HDPE 63 8.813 COMPLETE
3 HDPE 110 .544 COMPLETE
4 HDPE 140 .584 COMPLETE
5 HDPE 160 1.366 COMPLETE
6 HDPE 180 1.196 COMPLETE
7 HDPE 200 .612 COMPLETE
HSC Connection
Sno. Total Nos.
1 1026
Other Details
4.60
4.46
4.58
11-Jul-2024
12-Jul-2024