Project Completion Certificate (Ground Water)
Scheme ID: 20093466 Name of Scheme: MURWAN (GOGP) JJM No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 3440 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 10-Sep-2024 Actual Date of Completion (Capex): 16-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 29.8M/103M MURWAN 21.519156 80.216436
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 43.8M³/45M MURWAN 21.519156 80.216436
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225KL/16M MURWAN 21.519156 80.216436
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 0.029
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 2.661
2 HDPE PIPE PN:-6 75 2.442
3 HDPE PIPE PN:-6 90 1.694
4 HDPE PIPE PN:-6 110 0.456
5 HDPE PIPE PN:-6 125 0.519
6 HDPE PIPE PN:-6 140 0.00
7 HDPE PIPE PN:-6 160 0.00
8 HDPE PIPE PN:-6 180 1.482
9 HDPE PIPE PN:-6 200 0.04
HSC Connection
Sno. Total Nos.
1 675
Other Details
2.84
0.00
2.86
15-Jul-2025
23-Sep-2025