Project Completion Certificate (Ground Water)
Scheme ID: 20093521 Name of Scheme: SARHASA ZAMIN SARHASA, PAHARPUR GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 3550 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 19-Mar-2025 Actual Date of Completion (Capex): 19-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 plain pipe 150 mm dia 39 TW 26.096978 83.523978
2 plain pipe 300 mm dia 54 TW 26.096978 83.523978
3 slotted pipe 150 mm dai 30 TW 26.096978 83.523978
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 720LPM/44M TW 26.096978 83.523978
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 ZINCALUME TANK 225/14 OHT 26.096978 83.523978
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K7 125 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN6 PE 100 63 16.91
2 HDPE PN6 PE 100 75 3.02
3 HDPE PN6 PE 100 90 2.07
4 HDPE PN6 PE 100 110 0.20
5 HDPE PN6 PE 100 125 0.56
6 HDPE PN6 PE 100 140 0.80
7 HDPE PN6 PE 100 160 1.74
8 HDPE PN6 PE 100 180 0.39
HSC Connection
Sno. Total Nos.
1 541
Other Details
2.75
0.00
2.90
18-Mar-2025
19-Mar-2025