Project Completion Certificate (Ground Water)
Scheme ID: 20094053 Name of Scheme: Jaitpur Totaram No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1275 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-Apr-2024 Actual Date of Completion (Capex): 11-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.227
2 HDPE 75 0.986
3 HDPE 90 0.652
4 HDPE 110 0.177
5 HDPE 140 0.112
HSC Connection
Sno. Total Nos.
Other Details
1.08
1.32
1.32
14-Jun-2024
15-Jun-2024