Project Completion Certificate (Ground Water)
Scheme ID: 20094193 Name of Scheme: Bargawan No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1691 Base Year: 2023 Intermediate Year: 2038 Design Year: 2023
Date of Completion (As per Contract): 30-Apr-2023 Actual Date of Completion (Capex): 31-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 8/65.77 BARGAWAN 26°33'9620"N 79°82'99"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 150/69 BARGAWAN 26°33'9620"N 79°82'99"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 50/12 BARGAWAN 26°33'9620"N 79°82'99"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.32
2 HDPE 90 0.556
3 HDPE 110 0.175
4 HDPE 140 0.227
HSC Connection
Sno. Total Nos.
1 416
Other Details
1.92
0.00
1.52
07-May-2024
08-May-2024