Project Completion Certificate (Ground Water)
Scheme ID: 20094210 Name of Scheme: Kurhwa No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1408 Base Year: 2023 Intermediate Year: 2038 Design Year: 2023
Date of Completion (As per Contract): 30-Apr-2023 Actual Date of Completion (Capex): 31-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 5/66.26 KURWAH 26.28'57''N 80.00'40''E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 150/69 KURWAH 26.28'57''N 80.00'40''E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 50/12 KURWAH 26.28'57''N 80.00'40''E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.020
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.6
2 HDPE 90 0.09
3 HDPE 110 0.383
4 HDPE 140 0.049
HSC Connection
Sno. Total Nos.
1 350
Other Details
1.52
0.00
1.46
20-May-2024
21-May-2024