Scheme ID: 20094274 Name of Scheme: nigohi No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2043 Base Year: 2023 Intermediate Year: 2038 Design Year: 2023
Date of Completion (As per Contract): 30-Apr-2023 Actual Date of Completion (Capex): 31-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 7/66.40 NIGOHI 26.33'50''N 79.86'75''E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 500/74 NIGOHI 26.33'50''N 79.86'75''E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150/18 NIGOHI 26.33'50''N 79.86'75''E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.60
2 HDPE 90 1.137
3 HDPE 110 2.089
4 HDPE 140 0.043
HSC Connection
Sno. Total Nos.
1 422
Other Details
2.37
0.00
2.29
10-May-2024
11-May-2024