Project Completion Certificate (Ground Water)
Scheme ID: 20094293 Name of Scheme: udaipur No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1659 Base Year: 2023 Intermediate Year: 2038 Design Year: 2023
Date of Completion (As per Contract): 01-Dec-2024 Actual Date of Completion (Capex): 20-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell construction: Drilling of Borehole for Tubewell construction by DC/RC/DTH Rig Machine including transportaion, erection, dismantling of Rig and assosiated T&P complete in all respect including required all material labour etc. 90.54 UDAIPUR 26.179403 79.776293
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Energy Efficient AC submersible Pumping Plant 150 UDAIPUR 26.179403 79.776293
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 R.C.C / Zinc aluminium 50KL * 12 MTR UDAIPUR 26.179403 79.776293
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE K-7 100 0.15
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 3.44
2 HDPE PIPE 90 2.137
3 HDPE PIPE 110 0.374
4 HDPE PIPE 140 0.028
HSC Connection
Sno. Total Nos.
1 256
Other Details
1.82
1.82
1.44
01-Apr-2024
02-Apr-2024