| Scheme ID: 20094381 | Name of Scheme: RAYPUR WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 4285 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 13-Oct-2024 | Actual Date of Completion (Capex): 21-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 150MM PLAIN PIPE | 6 | RAYPUR | 26.12498 | 82.034159 |
| 2 | 300MM PLAIN PIPE | 47.5 | RAYPUR | 26.12498 | 82.034159 |
| 3 | 300MM SLOTTED PIPE | 21 | RAYPUR | 26.12498 | 82.034159 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUMERSIBLE PUMP | 900 LPM / 54 M | RAYPUR | 26.12498 | 82.034159 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 275 KL / 16MTR | RAYPUR | 26.12498 | 82.034159 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 150 | 0.015 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE (63-200) | 200 | 17.644 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 670 |