Project Completion Certificate (Ground Water)
Scheme ID: 20094401 Name of Scheme: DEOKALI WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 8
Total Population Covered: 5542 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 13-Apr-2025 Actual Date of Completion (Capex): 04-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150MM PLAIN PIPE 34.30 DEOKALI 26.492585 81.681869
2 150MM SLOTTED PIPE 12 DEOKALI 26.492585 81.681869
3 200MM PLAIN PIPE 136 DEOKALI 26.492585 81.681869
4 200 SLOTTED PIPE 28 DEOKALI 26.492585 81.681869
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PIMP 590LPM / 54MTR DEOKALI 26.492585 81.681869
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 350KL / 16MTR DEOKALI 26.492585 81.681869
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 .267
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 9.323
2 HDPE PIPE 63 15.89
3 HDPE PIPE 110 920
4 HDPE PIPE 140 .436
5 HDPE PIPE 160 .233
6 HDPE PIPE 200 .023
HSC Connection
Sno. Total Nos.
1 1248
Other Details
6.42
0.00
6.16
05-Dec-2024
10-Mar-2025