Project Completion Certificate (Ground Water)
Scheme ID: 20094784 Name of Scheme: CHAUNA VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2860 Base Year: 2022 Intermediate Year: 2036 Design Year: 2052
Date of Completion (As per Contract): 20-Mar-2024 Actual Date of Completion (Capex): 30-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24M/90M CHAUNA 28.636444 77.588971
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERCIBLE 600LPM/55M CHAUNA 28.636444 77.588971
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175KL/14M CHAUNA 28.636444 77.588971
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.09
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.274
2 HDPE 75 2.127
3 HDPE 90 1.010
4 HDPE 110 0.202
5 HDPE 140 0.144
6 HDPE 160 0.483
HSC Connection
Sno. Total Nos.
1 492
Other Details
2.14
2.18
2.18
30-Mar-2024
01-Apr-2024