Project Completion Certificate (Ground Water)
Scheme ID: 20094912 Name of Scheme: MATIALA VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2130 Base Year: 2022 Intermediate Year: 2033 Design Year: 2052
Date of Completion (As per Contract): 30-Sep-2024 Actual Date of Completion (Capex): 30-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24/105 matiyala 28.71663551 77.49712796
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 300LPM/51M Matiyala 28.71663551 77.49712796
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100/12 Matiyala 28.71663551 77.49712796
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 100 100 25
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.445
2 HDPE 75 .099
3 HDPE 90 .446
4 HDPE 110 .115
5 HDPE 125 1.007
HSC Connection
Sno. Total Nos.
1 338
Other Details
1.31
1.36
1.36
01-Apr-2025
05-Apr-2025