Project Completion Certificate (Ground Water)
Scheme ID: 20095164 Name of Scheme: ALLIPUR No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 4630 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 14-May-2024 Actual Date of Completion (Capex): 30-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 19.0 M / 138.45 m ALLIPUR 25°.828567"N 81.07864"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 400LPM / 60 M ALLIPUR 25°.828567"N 81.07864"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 KL / 14 M ALLIPUR 25°.828567"N 81.07864"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. K-9 80 0.012
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 180 0.185
2 HDPE 160 0.086
3 HDPE 125 0.36
4 HDPE 110 0.607
5 HDPE 90 0.959
6 HDPE 75 0.7
7 HDPE 63 8.0333
HSC Connection
Sno. Total Nos.
1 837
Other Details
2.10
0.00
2.06
12-Jan-2024
12-Feb-2024