Project Completion Certificate (Ground Water)
Scheme ID: 20095656 Name of Scheme: SADAKPUR VILLAGE WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2518 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 03-Apr-2023 Actual Date of Completion (Capex): 23-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN -6: CLASS PE -100 63 4.37
2 HDPE PIPE PN -6: CLASS PE -100 75 0.21
3 HDPE PIPE PN -6: CLASS PE -100 90 0.21
4 HDPE PIPE PN -6: CLASS PE -100 125 0.30
HSC Connection
Sno. Total Nos.
Other Details
1.44
1.44
1.37
23-Oct-2024
24-Oct-2024